Changing many cells in Excel to recalculate new values after VAT changes

So you have a spreadsheet with lots of values in – future monthly invoices for service contracts, say. Actual values, not calculations which multiply up by a VAT rate stored in another cell, or a named range, or even as a fixed number in a formula. And the Chancellor of the Exchequer just announced that the VAT rate (sales tax for our colonial cousins) has changed so all your values are now going to be wrong for the next twelve months.

What can you do to change many cells at once by a specific amount?

A few approaches spring to mind, depending on the scale of the problem and the structure of your data.

Read more of this post

Passed 70-291 to become MCSA:Messaging

“Implementing, Managing, and Maintaining a Windows 2003 server Network Infrastructure”, also known as The Beast has been slain.
Turned out to be a cuddly bunny rather than a beast (a bit like the end of Monty Python’s holy grail only in reverse).

I had put this off for so long because I thought I was weak on a couple of areas and needed some polish, and since everyone says it is one of the hardest I wanted to be sure to nail it.
But I was in the exam centre on Friday anyway (taking my CRM Applications exam MB2-632, also nailed) and I had second shot to back me up, so I figured “what the hell, even if I fail majestically at least I will know much more accurately what to expect on this one next time”.

So I waltzed away with 889 in a shade under half the time available (105 minutes out of 215 – I know some do better than that but I was well pleased with the result). Finally gave me my MCSA:Messaging and only two more to go (293 and 294) to MCSE.

Read more of this post